Widening and Upgrading of Road to Black Top standard Along Shahigaun-Ramagad Road (14+000 to 26+000 Km)
Agreement Date: 6/15/2076
Completion Date: 2078/11/30 (82.00%)
Value (With VAT) : NRs. 49,66,67,583.74
Agreement Date: 6/15/2076
Completion Date: 2078/11/30 (82.00%)
Value (With VAT) : NRs. 49,66,67,583.74
heavy-excavator-digging-day-light(1)Poon-Hill-trek-day-4-1-5

Work ​Description

Contract ID: MIDHLPD/3371384/075/76-502
  • Roaday excavation-161,109.66 cum
  • Formation of embankment-10,040.40 cum
  • Excavation for foundation -40,326.83 cum
  • Stone soiling works-2,120.58 cum
  • M10-plain cement concrete works-431.00 cum
  • M20 cement concrete works-1,918.28 cum
  • M25-cement concrete works-1,680.16 cum
  • Reinforcement works -107.56 Mt
  • Random Rubble Stone Masonary works-14,041.10 cum
  • NP3 Hume pipe laying wprls …..600mm internal diameter-262.50Rm/900mm internal diameter -167.50 Rm
  • M15/40 Plum concrete works-7,414.78 cum
  • Gabion Structure works – 18,978.25 cum
  • Sub Grade works-101,789.70 sqm
  • Sub base works-20,366.75 cum
  • Base works -13,055.00 cum
  • Bituminous prime coat-42,998.30 Ltr
  • Modified binder -81,786.89 Ltr
  • Bitumen cutter works -4,766.00 Ltr
  • Anti Stripping Agent works-481.00 kg
  • Surface dressing works(1st coat&2nd coat)-77,221.16 sqm
  • Formworks for rigid pavement-658.65 sqm

Name of​ Client & Contract Person

  • Pushpalal (Mid Hill) Highway Project Office, Dailekh

Joint ​ Venture

Name of JV  :
  • Kankai
  • Motidan
JV Share
0%
  • Roadway excavation Ina types o soil including rock-79,676.07 m3
  • NP3 Humpipe 900mm dia supply and laying Works-55.OO Rm
  • Gabion works- 11104.75
  • RRM works-1,643.36 m3
  • Saljhandi-Sandhikharka-Dhorpatan Road Project
Name of JV  :
  • M/S. Motidan Construction Sewa Pvt. Ltd.
My Skill
Web Designer 50%
Project Details

Roadway Excavation , Hume pipe culvert,Gabion/Masonary wall construction , side drain and Graveling works (Chainage 0+000 to 5+300)