Roadway Excavation, Road Structure ,Gravelling and Traffic Sign Post Works in Subha Shree Agni Cement Quarry Site Access Road (Bagdula- Andheri- Section )
Agreement Date: 2/28/2073
Completion Date: 6/27/2075
Value (With VAT) : NRs. 14,61,52,104.9
Agreement Date: 2/28/2073
Completion Date: 6/27/2075
Value (With VAT) : NRs. 14,61,52,104.9
doxerrrrrR (2)

Work ​Description

Contract ID: DROBKT/602801/4/2072/073/151
  • Roadway excavation in all type of soil including hard work -37,054.43 cum
  • Excavation of metal road-16,834.36cum
  • Stone soiling works-433.79 cum
  • M10/40 cement concete works-214.43 cum
  • 1:2:4 cement concete works-138.06 cum
  • M20/20 cement concete works-119.07 cum
  • Reinforcement works-6.87 MT
  • Random Rubble Stone Masonry works-2528.36 cum
  • Gabion structure works-2517.00 cum
  • Brick Masonry works-196.74 cum
  • NP3 Hume pipe laying works /300mm internal diameter -45 Rm / 450mm internal diameter -180 Rm / 600mm internal diameter -470 Rm
  • Kerbstone Block (M25,38*20*25cm) for footpath-499.70 Rm
  • interlocking Block(M25,60 mm thick)-981.20 sqm
  • Sub-Grade works-5,211.00 sqm
  • Sub-base works-3,938.84 cum
  • Crusher Run Material (CRM) for Base course- 5,030.65 cum
  • Bituminous Peime cost-18721.65 Ltr
  • Bituminous Track Cost-69347.46 Ltr
  • Asphalt Concrete Works (Length:16.033KM,98069.29sqm)-4,133.62 cum
  • Bituminous surface-5763.30 sqm
  • Thermoplastic road making plaint-4,696.25 sqm

Name of​ Client & Contract Person

  • Division Road office,Bhaktapur

Joint ​ Venture

Name of JV  :
  • Motidan
  • The Kanchanjunga
JV Share
0%
  • Roadway excavation Ina types o soil including rock-79,676.07 m3
  • NP3 Humpipe 900mm dia supply and laying Works-55.OO Rm
  • Gabion works- 11104.75
  • RRM works-1,643.36 m3
  • Saljhandi-Sandhikharka-Dhorpatan Road Project
Name of JV  :
  • M/S. Motidan Construction Sewa Pvt. Ltd.
My Skill
Web Designer 50%
Project Details

Roadway Excavation , Hume pipe culvert,Gabion/Masonary wall construction , side drain and Graveling works (Chainage 0+000 to 5+300)