Road extension and improvement of Panchakanya Marg Bishnu 2 Deuba Niwas Girija Prasad Koirala Shanti Park Sundari Sadak
Agreement Date: 1/19/2075
Completion Date: 7/1/2077
Value (With VAT) : NRs. 16,89,52,394.7
Agreement Date: 1/19/2075
Completion Date: 7/1/2077
Value (With VAT) : NRs. 16,89,52,394.7
sadakC9502.00_21_44_03.Still015

Work ​Description

Contract ID: DROKTM/3371494/073/74/162 (Re)

  • Sub base-3106.96 cum
  • Base-261.15cum
  • Tack cost-983.06 Ltr
  • Asphalt concrete-69.96 cum
  • Cement concreteM15-1489.04 cum
  • Cement concreteM20-314.39 cum
  • Cement concreteM25-3493.14 cum Reinforcement-176.53 MT
  • Brick masonry-42.29 cum
  • Stone masonry -304.64 cum
  • Plum concrete(70%-30%)-6234.65 cum 200 mm dia RCC NP3
  • Hume pipe-105.00 Rm 450 mm dia RCC NP3
  • Hume pipe-25.00 Rm 600 mm dia RCC NP3
  • Hume pipe -215.00 Rm 900mm dia RCC NP33
  • Hume pipe-215.00 Rm kerb stone (M15)-291.20 Rm
  • Enamel painting-116.48 sqm
  • Themoplastick road markinf painting-68.09 sqm

Name of​ Client & Contract Person

  • Road Division Kathmandu, Minbhawan, Kathmandu

Joint ​ Venture

Name of JV  :
  • Gajurmukh
  • Motidan
  • Baniya
JV Share
0%
  • Roadway excavation Ina types o soil including rock-79,676.07 m3
  • NP3 Humpipe 900mm dia supply and laying Works-55.OO Rm
  • Gabion works- 11104.75
  • RRM works-1,643.36 m3
  • Saljhandi-Sandhikharka-Dhorpatan Road Project
Name of JV  :
  • M/S. Motidan Construction Sewa Pvt. Ltd.
My Skill
Web Designer 50%
Project Details

Roadway Excavation , Hume pipe culvert,Gabion/Masonary wall construction , side drain and Graveling works (Chainage 0+000 to 5+300)