Construction of Headworks ,Canal and Canal Structures Of Jammunai Khola Pratapur Irrigation
Agreement Date: 10/2/2073
Completion Date: 8/21/2077
Value (With VAT) : NRs. 107262435.23
Agreement Date: 10/2/2073
Completion Date: 8/21/2077
Value (With VAT) : NRs. 107262435.23
 
a building on goingabridge on going

Work ​Description

Contract ID: JKIP/MIP/NCB01/073-74

  • Earthworks excavation in foundation of H/W in ordinary soil by machine-39,434.85 cum
  • Earthworks excavation in ordinary soil by labour-565.16 cum
  • Earthworks excavation in shallow water depth by machine-14,056.00 cum
  • E/W in excavation in embankment by machinewith dressing as per pecification all complete-27,620.94 cum
  • E/W in filling for canal with ordinary soil borrow materials as per specification -1,441.45 cum
  • Back Filling work-3,653.54 cum
  • cement concerting works in (1:3:6)-2,809.25 cum
  • cement concerting works in (1:2:4)-2,557.33 cum
  • Reinforcement works-1,85,493.45 kg
  • Wooden form works-8,158.29 sqm
  • Suppling weaving placing and tying of 10 gauge commercial G.L wire with double-10,868.30 sqm
  • Boulder supply and filling in gabion boxes-1,994.64 cum
  • Graded gravel filter material-962.56 cum / Rubber seal-149.61 Rm / Iron Sheet pile works-381.80 sqm / Steel gates at headworks-14.80 sqm / Grassturfing works – 1200 sqm

Name of​ Client & Contract Person

  • Water Resource and Irrigation Development Division, Bara, Kalaiya

Joint ​ Venture

Name of JV  :
  • M/S Gajurmukhi
  • Motidan JV
JV Share
0%
  • Roadway excavation Ina types o soil including rock-79,676.07 m3
  • NP3 Humpipe 900mm dia supply and laying Works-55.OO Rm
  • Gabion works- 11104.75
  • RRM works-1,643.36 m3
  • Saljhandi-Sandhikharka-Dhorpatan Road Project
Name of JV  :
  • M/S. Motidan Construction Sewa Pvt. Ltd.
My Skill
Web Designer 50%
Project Details

Roadway Excavation , Hume pipe culvert,Gabion/Masonary wall construction , side drain and Graveling works (Chainage 0+000 to 5+300)