Earthwork for Track opening and structural works along Pejung-Hatiya Section (Ch 107+000 to 122+140)
Contract ID : NSKRP/3371454/072/073-06
Work Description : Earthwork in Excavation-6,26,926.95Cu.m Gabion work-36,116 Cu.m Dry Stone Masonry-4428.78 Cu.m
Name of JV : Gajurmukhi/ Motidan/ Geetanjali
Name of client and contract person : North South (Koshi) Road Project
JV Share : 33%
Agreement date : 3/30/2073
Completion Date : 8/18/2077
Value of contract (NRs. With VAT) : NRs.52,29,57,729.49
Work Description : Earthwork in Excavation-6,26,926.95Cu.m Gabion work-36,116 Cu.m Dry Stone Masonry-4428.78 Cu.m
Name of JV : Gajurmukhi/ Motidan/ Geetanjali
Name of client and contract person : North South (Koshi) Road Project
JV Share : 33%
Agreement date : 3/30/2073
Completion Date : 8/18/2077
Value of contract (NRs. With VAT) : NRs.52,29,57,729.49
Roadway Excavation , Hume pipe culvert,Gabion/Masonary wall construction , side drain and Graveling works (Chainage 0+000 to 5+300)
Contract ID : SSDRP/3373354/071/072-025
Work Description :Roadway excavation in all types of soli including rock-79,676.07 m3
Name of client and contract person : Saljhandi-Sandhikharka-Dhorpatan Road Project
JV Share : 100%
Agreement date : 3/30/2072
Completion Date : 7/15/2073
Value of contract (NRs. With VAT) : NRs.2,97,28,166.2
Work Description :Roadway excavation in all types of soli including rock-79,676.07 m3
- RRM works-1,643.36 m3
- NP3 Humpipe 900mm dia supply and laying Works-55.00 Rm
- Gabion works-1,104.75
Name of client and contract person : Saljhandi-Sandhikharka-Dhorpatan Road Project
JV Share : 100%
Agreement date : 3/30/2072
Completion Date : 7/15/2073
Value of contract (NRs. With VAT) : NRs.2,97,28,166.2
Roadway Excavation , Hume pipe culvert,Gabion/Masonary wall construction , side drain and Graveling works (Chainage 0+000 to 5+300)
Contract No: MIDHLKKTM/3371384/2072/73-201
The road works was started in 23/11/2072 and completed in 25/12/2078.
Employee: Puspalal (Mid Hill) Highway Project Office, Phidim
Salient Features of the projects:
The project has been awarded to the The Kanchanjunga- Rayamajhi – Motidan JV
The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side earthen drain, subgrade works, subbase works, prime/track coat, DBST works, Traffic Safety works and Bio-engineering works etc.
Contract Amount: NRS. 410,139,514.00
The road works was started in 23/11/2072 and completed in 25/12/2078.
Employee: Puspalal (Mid Hill) Highway Project Office, Phidim
Salient Features of the projects:
The project has been awarded to the The Kanchanjunga- Rayamajhi – Motidan JV
The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side earthen drain, subgrade works, subbase works, prime/track coat, DBST works, Traffic Safety works and Bio-engineering works etc.
Contract Amount: NRS. 410,139,514.00
Road Widening and Improvement Works of Kulekhani-Sisneri-Chhaimale-Dakshinkali Road (Working Sector Sisneri to Kulekhani CH 21+000 to 26+800)
Contract ID : DROHTD/337305-4/073-74/204
Work Description : Roadway excavation in all types of rocks and soils -69020.27 cum / Formation of embankment including compaction-10204.50 cum / Gabion works for retain wall / brest wall / cheek dam-9158.50 cum / Plum concrete with 60% M15/40 concrete and 40% boulders/ stones-3221.09 cum / PCC M15/40-440.81 cum / RRM work in 1:4 C/S morter -4135.65 cum /Providing and laying of plain cement concrete M20-93.00 cum Providing and laying fitting and placing un- coated mild steel/HYSD reinforcement complete -4.82 MT /Laying of single/doble/muliple bituminous coats for surface dressing (DBST) first coat-497.20 MT /Laying of single/doble/muliple bituminous coats for surface dressing (DBST) second coat-552.33 MT / Provide and erecting "W" metal beam crash barrier-3695.00 RM
Name of JV : Motidan/Gajurmukhi JV
Name of client and contract person : Infrastructure Development Office, Makwanpur, Chitwan
JV Share : 49%
Agreement date : 3/30/2074
Completion Date : 12/30/2078
Value of contract (NRs. With VAT) : NRs.16,78,67,380.78
Work Description : Roadway excavation in all types of rocks and soils -69020.27 cum / Formation of embankment including compaction-10204.50 cum / Gabion works for retain wall / brest wall / cheek dam-9158.50 cum / Plum concrete with 60% M15/40 concrete and 40% boulders/ stones-3221.09 cum / PCC M15/40-440.81 cum / RRM work in 1:4 C/S morter -4135.65 cum /Providing and laying of plain cement concrete M20-93.00 cum Providing and laying fitting and placing un- coated mild steel/HYSD reinforcement complete -4.82 MT /Laying of single/doble/muliple bituminous coats for surface dressing (DBST) first coat-497.20 MT /Laying of single/doble/muliple bituminous coats for surface dressing (DBST) second coat-552.33 MT / Provide and erecting "W" metal beam crash barrier-3695.00 RM
Name of JV : Motidan/Gajurmukhi JV
Name of client and contract person : Infrastructure Development Office, Makwanpur, Chitwan
JV Share : 49%
Agreement date : 3/30/2074
Completion Date : 12/30/2078
Value of contract (NRs. With VAT) : NRs.16,78,67,380.78
Road Widening , Gabion Wall, Hume pipe culvert, Masonry Drain and DBST construction works from saljhandhi to Kanchan River section at SSDRP
Contract ID : SSDRP/3371204/071/072-018
Work Description :
Name of client and contract person : Saljhandi-Sandhikharka-Dhorpatan Road Project
JV Share : 49%
Agreement date : 2/24/2072
Completion Date : 10/25/2075
Value of contract (NRs. With VAT) : NRs.7,49,32,240.9
Work Description :
- Stone Masonry Work with cement mortar - 2528.29 m³
- M15/40 Cement Concrete - 1364.37 m³
- M25/20 Grade Concrete - 482.12 m³
- Reinforcement (HYSD Bars) - 43.67 MT
- Gabion works - 8.11 m³
- Dry Stone Soling - 83.53 m³
- Sub-Grade works - 21626 m³
- Sub-Base Course Work - 4940.57 m³
- Base Course Work - 2807.13 m³
- DBST Works for Surface Dressing
- Prime Cost MC30/MC70 - 19806.00 Lit
- 20mm Nominal Size Chips - 250.43 MT
- Bitumen Binder Grade 80/100 - 22231.15 Lit
- 10mm Nominal Size Chips - 130.22 MT
Name of client and contract person : Saljhandi-Sandhikharka-Dhorpatan Road Project
JV Share : 49%
Agreement date : 2/24/2072
Completion Date : 10/25/2075
Value of contract (NRs. With VAT) : NRs.7,49,32,240.9
Roadway Excavation and movement up to Gravel top standard along Bahunepati-Dolalghat-Chauri Khola Ramechhap
Contract No: MIDHLK-TM/3371384/2074/75-004
The road works was started in 2/22/2018 and completed in 7/14/2021.
Employee: Mid hill Highway Project (Eastern Section) Buddhanagar, Kathmandu
Salient Features of the projects: The project has been awarded to the The Kanchanjunga- Motidan – Baniya JV
The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side earthen drain, subgrade works, subbase works etc.
Contract Amount: NRS 34,67,52,405.99
The road works was started in 2/22/2018 and completed in 7/14/2021.
Employee: Mid hill Highway Project (Eastern Section) Buddhanagar, Kathmandu
Salient Features of the projects: The project has been awarded to the The Kanchanjunga- Motidan – Baniya JV
The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side earthen drain, subgrade works, subbase works etc.
Contract Amount: NRS 34,67,52,405.99
Roadway Construction by widening , Grade/bend improvement,Gravelling, Gabion Retaining wall,Masonry Wall Construction and cross Drainage works at Patauti-Kharjang-Tamghas Road
Contract ID : SSDRP/3373354/071/072-024
Work Description :Earthwork in excavation for Roadway construction in all type of soil including hard rock-118,389.00 m3
Name of client and contract person : Saljhandi-Sandhikharka-Dhorpatan Road Project
JV Share : 100%
Agreement date : 3/30/2072
Completion Date : 7/15/2073
Value of contract (NRs. With VAT) : NRs.2,91,36,327.2
Work Description :Earthwork in excavation for Roadway construction in all type of soil including hard rock-118,389.00 m3
- RRM works-1,135.06 m3
- NP3 Humpipe 900 mm dia supply and laying works -105.00 Rm
- Gabion works-2568.00 m3
Name of client and contract person : Saljhandi-Sandhikharka-Dhorpatan Road Project
JV Share : 100%
Agreement date : 3/30/2072
Completion Date : 7/15/2073
Value of contract (NRs. With VAT) : NRs.2,91,36,327.2
Construction of road structures, cross drainage and gravelling works from Khursane Daha (17+000) to Nigali (35 +000) Section of Saljhandi -Sandhikhrka -Dhorpatan Road
Contract ID : SSDRP/3371204/074/75-003
Work Description :
Name of client and contract person :Department of Road, Saljhandi Sandhikharka Dhorpatan Road Project,Sandhikharka, Arghaghanchi
JV Share : 60%
Agreement date : 2/21/2075
Completion Date : 5/25/2076
Value of contract (NRs. With VAT) : NRs.7,98,51,779.9
Work Description :
- Roadway Excavation - 41,963.42 m³
- Gabion Works - 4432.50 m³
- Masonry Works - 4838.67 m³
- H/P Culvert (900mm) - 205.00 rm
- H/P Culvert (600mm) - 25.00 rm
- Gravel Works - 10,235.09 m³
Name of client and contract person :Department of Road, Saljhandi Sandhikharka Dhorpatan Road Project,Sandhikharka, Arghaghanchi
JV Share : 60%
Agreement date : 2/21/2075
Completion Date : 5/25/2076
Value of contract (NRs. With VAT) : NRs.7,98,51,779.9
Road Construction and Upgrading Works Inside the Factory Premises & Different Mining Sites
The road works was started in 8/15/2072 and completed in 3/22/2075.
Employee: Shivam Cement Pvt. Ltd.
Salient Features of the projects:
The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, bio-engineering works, road safety works etc.
Contract Amount: NRS. 28,28,04,838.1
Employee: Shivam Cement Pvt. Ltd.
Salient Features of the projects:
The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, bio-engineering works, road safety works etc.
Contract Amount: NRS. 28,28,04,838.1
The road works was started in 14/11/2072 and completed in 30/06/2075.
(Chainage: 7+360 to 22+500) Makwanpur District (Works as a Sub-contractor)
The road works was started in 3/28/2072 and completed in 9/14/2075.
Employee: Kanti Lokpath Road Project, Lalitpur
Salient Features of the projects: The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 33,26,49,341.26
The road works was started in 3/28/2072 and completed in 9/14/2075.
Employee: Kanti Lokpath Road Project, Lalitpur
Salient Features of the projects: The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 33,26,49,341.26
Road Widening and Improvement works at Aaale Bhanjyana
Baguwa Road Sector Chaingage:40+300 to 51+000, Makwanpur District
The road works was started in 5/25/2071 and completed in 3/15/2075.
Employee: Kanti Lokpath Road Project
Salient Features of the projects:
The project has been awarded to the SCC – Motidan Construction JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS. 7,80,11,058.76
The road works was started in 5/25/2071 and completed in 3/15/2075.
Employee: Kanti Lokpath Road Project
Salient Features of the projects:
The project has been awarded to the SCC – Motidan Construction JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS. 7,80,11,058.76
Upgrading of Rudrabeni wamitaksar Daramkhola Road
Gulmi Section (Ch : 37+630 to 47 +210 KM)
The road works was started in 5/31/2073 and completed in 3/31/2076.
Employee: Road Infrastructure Development Office, Kapilvastu
Salient Features of the projects:
The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS 11,76,36,548.40
The road works was started in 5/31/2073 and completed in 3/31/2076.
Employee: Road Infrastructure Development Office, Kapilvastu
Salient Features of the projects:
The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS 11,76,36,548.40
Rehabiltation of Dhulikhel to Pannchakal of ARM Road Sector
The road works was started in 2/28/73 and completed in 6/30/75.
Employee: Division Road Office, Bhaktapur
Salient Features of the projects:
The project has been awarded to the The Kanchanjunga- Motidan JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 145363721.71
Employee: Division Road Office, Bhaktapur
Salient Features of the projects:
The project has been awarded to the The Kanchanjunga- Motidan JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 145363721.71
Road Widening and Improvement works at Baguwa
Maash Khola Road Road Sector Chainage:51+000 to 60+000, Latipur District
Employee: Kanti Lokpath Road Project
Salient Features of the projects:
The project has been awarded to the Motidan – The Kanchanjunga JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS. 10,68,43,250.20
Employee: Kanti Lokpath Road Project
Salient Features of the projects:
The project has been awarded to the Motidan – The Kanchanjunga JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS. 10,68,43,250.20
Road Upgrading works at Aaale Bhanjyang-Baguwa Road
Chainage: 40+500 to 51+000) Makwanpur District
The road works was started in 7/12/2016 and completed in 7/6/2020.
Employee: Kanti Lokpath Road Project, Lalitpur
Salient Features of the projects:
The project has been awarded to the Shrestha- Motidan-Baniya JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 24,53,08,092.62
The road works was started in 7/12/2016 and completed in 7/6/2020.
Employee: Kanti Lokpath Road Project, Lalitpur
Salient Features of the projects:
The project has been awarded to the Shrestha- Motidan-Baniya JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 24,53,08,092.62
Widening/Upgrading of Shubha Shree Agni Cement access road Bagdula-Adheri-Folipi Section
The road works was started in 14/11/2072 and completed in 30/06/2075.
Employee: Division Road Office, Pyuthan
Salient Features of the projects:
The project has been awarded to the The Kanchanjunga- Motidan JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works road side drain, subgrade works, subbase works, bio-engineering works, road safety works etc.
Contract Amount: NRS. 10,51,52,716.80
Employee: Division Road Office, Pyuthan
Salient Features of the projects:
The project has been awarded to the The Kanchanjunga- Motidan JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works road side drain, subgrade works, subbase works, bio-engineering works, road safety works etc.
Contract Amount: NRS. 10,51,52,716.80
Road Construction and Upgrading Works inside the factory premises and different mining sites road and river protection works
The road works was started in 5/7/2075 and completed in 22/2/2076.
Employee: Riddhi Siddhi Cement Pvt. Ltd.
Salient Features of the projects:
The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS. 26,91,61,208.00
Employee: Riddhi Siddhi Cement Pvt. Ltd.
Salient Features of the projects:
The project has been awarded to the Motidan Construction Sewa Pvt. Ltd. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works etc.
Contract Amount: NRS. 26,91,61,208.00
Road extension and Improvement of 35 Khahare Mulpani Gandhi Marg
The road works was started in 5/2/2018 and completed in 7/14/2020.
Employee: Division Road, Kathmandu
Salient Features of the projects: The project has been awarded to the Motidan – The Kanchanjunga JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 24,38,08,317.33
Employee: Division Road, Kathmandu
Salient Features of the projects: The project has been awarded to the Motidan – The Kanchanjunga JV. The project work comprises of earthwork excavation in all kinds of soil and structure and drains, RCC/PCC works, RCC Hime Pipe laying, retaining structure works of masonry/gabion works, road side drain, subgrade works, subbase works, base course, prime/track course, asphalt works, bio-engineering, road furniture works etc.
Contract Amount: NRS. 24,38,08,317.33